Bendix tech tips: Air chamber maintenance and replacement

Top tips for wheel end air chamber maintenance and replacement

After the old chamber is removed, be sure the mounting surfaces are clean and undamaged. Fit the new chamber to the bracket, then secure it with the mounting hardware—always use the new hardware included with the new chamber. Once the chamber is in place, torque the nuts to 144 ±11 ft./lbs.

On a drum brake, the next step is adjusting the slack straight into the clevis on the pushrod and lining up the large clevis pin holes—this permits some up-and-down movement if it’s needed to insert the clevis pin. Once the large pin is in place, push up on the bottom of the small adjuster link and back off the slack to re-engage the link. Then line up the small clevis pin holes on the link and install the small pin. Back the adjuster off a bit to bring the adjusting rod down, lining it up to place the small pin. If the small pin doesn’t line up with the placement holes easily, the adjuster can be adjusted up or down to ease the process.

Fix the large and small clevis pins in place using the washers sized for each, and secure them with cotter pins. Remember to use pliers and bend the “ears” on each of the cotter pins to prevent them from slipping out.

The brake can now be adjusted to the proper specs according to the chamber size.

Air line hookup, chamber clocking

At this point, the chamber can be connected to the air supply. If the chamber port is in the proper position for air line hookup, make the connection, pressurize the chamber, and check the fittings for leaks using a soapy water mixture. Once it checks out leak-free, release the air off the chamber and adjust the brakes to the proper stroke.

If the chamber port isn’t in the right place to receive the airline, the cover/spring brake chamber will need to be “clocked,” or rotated into position. Without an air supply, the pushrod will need to be pried into the applied position using a pry bar. After doing so, clamp a vise grip onto the pushrod at the base of chamber to hold it in position.

Next, loosen the service-side clamp bolts on the chamber cover. With the bolts removed, the clamp will loosen, and can be hung over the chamber cam—out of the way, but easily reachable when it’s time to replace it.

Now, simply rotate the chamber cover into a position where the air supply line can meet the port and fit snugly without stretching or kinking the hose. Do not secure the hose yet: Simply check to make sure the port is in the proper orientation.

Once it’s in place, hold the cover and diaphragm in position over the chamber base. Remount the clamp, checking during the process for a good seal all the way around, without the diaphragm being exposed on one side more than the other. When tightening the clamp, alternate the process between the top and bottom bolts to tighten them evenly, and torque them to 25 ±5 ft./lbs.

The air line can now be attached to the fitting. Apply service pressure to let the pushrod come loose, and release the vise grips. Spray the area around the band clamp and hose fittings with a soapy water mix to check for leaks, then release the pressure and, if it’s a drum brake, let the slack adjuster return to the released position.

“Attention to detail is crucial, even during routine maintenance and part replacement,” Pfost said. “So you should always refer to manufacturer guidelines and service data sheets for specific guidelines and part instructions in order to get the best, safest performance and longest life from your chambers and air brake system as a whole.”

This article was contributed by Bendix as part of their Tech Tips series. For more Tech Tips, visit bendix.com.

You May Also Like

Mercedes-Benz delivers truck with 1,000-ton towing capacity to German customer

The maximum trailer load of this Arocs SLT 4463 AS 8×6 is 1,000 tons.

Mercedes-heavy-duty-global-1400

Mercedes-Benz Trucks has delivered a specially converted truck for heavy-duty transport (SLT) to the Viktor Baumann company. The maximum trailer load of this Arocs SLT 4463 AS 8x6 is 1,000 tons. For the transportation of such particularly large loads, the truck will drive in combination with several coupled trucks, so the gross combination weight can exceed 1,000 tons. The fleet says it will use their new truck for the transportation of transformers and heat exchangers.

United Natural Foods to deploy eCascadia and VNR Electric trucks

UNFI will combine these trucks with refrigerated trailers cooled by Carrier’s all-electric Vector eCool TRU.

United-Natural-Foods-1400
Daimler Truck delivers Freightliner eCascadias to Reyes Coca-Cola Bottling

The 20 Freightliner eCascadias are expected to result in the reduced use of 40,000 gallons of diesel fuel per year. 

Daimler-Trucks-Coke
Nicholas Trucking on cutting costs and emissions

Early success with propane-powered trucks has the fleet planning to replace more diesel trucks.

nicholas-propane-truck2-1400
Kenworth ADAS adds new features for T680

Adaptive Cruise Control Stop and Auto Go and Highway Departure Braking to Zero features are now available.

Kenworth-Donates-T680

Other Posts

Truck driving safety requires attention

It’s hard to focus on safety when you’re focused on shifting. Episode two of the Fuel Efficiency Faceoff shows why.

EPS-2-faceoff2-1400
ACT Research: For-Hire Demand Outlook remains soft this winter

Freight demand fundamentals are gradually improving, ACT says.

generic-highway-city
Used Class 8 truck prices fell slightly in September; auction prices rose

ACT Research expects lower prices through the end of 2023.

Used-Cl8-Retail-Summary-Heat-Map-September-2023-Final
Class 8 orders down but within expectations, according to FTR

FTR reports that Class 8 orders for October came in at 28,000 units.

june-column-truck-generic