Bendix tech tips: Air chamber maintenance and replacement

Top tips for wheel end air chamber maintenance and replacement

After the old chamber is removed, be sure the mounting surfaces are clean and undamaged. Fit the new chamber to the bracket, then secure it with the mounting hardware—always use the new hardware included with the new chamber. Once the chamber is in place, torque the nuts to 144 ±11 ft./lbs.

On a drum brake, the next step is adjusting the slack straight into the clevis on the pushrod and lining up the large clevis pin holes—this permits some up-and-down movement if it’s needed to insert the clevis pin. Once the large pin is in place, push up on the bottom of the small adjuster link and back off the slack to re-engage the link. Then line up the small clevis pin holes on the link and install the small pin. Back the adjuster off a bit to bring the adjusting rod down, lining it up to place the small pin. If the small pin doesn’t line up with the placement holes easily, the adjuster can be adjusted up or down to ease the process.

Fix the large and small clevis pins in place using the washers sized for each, and secure them with cotter pins. Remember to use pliers and bend the “ears” on each of the cotter pins to prevent them from slipping out.

The brake can now be adjusted to the proper specs according to the chamber size.

Air line hookup, chamber clocking

At this point, the chamber can be connected to the air supply. If the chamber port is in the proper position for air line hookup, make the connection, pressurize the chamber, and check the fittings for leaks using a soapy water mixture. Once it checks out leak-free, release the air off the chamber and adjust the brakes to the proper stroke.

If the chamber port isn’t in the right place to receive the airline, the cover/spring brake chamber will need to be “clocked,” or rotated into position. Without an air supply, the pushrod will need to be pried into the applied position using a pry bar. After doing so, clamp a vise grip onto the pushrod at the base of chamber to hold it in position.

Next, loosen the service-side clamp bolts on the chamber cover. With the bolts removed, the clamp will loosen, and can be hung over the chamber cam—out of the way, but easily reachable when it’s time to replace it.

Now, simply rotate the chamber cover into a position where the air supply line can meet the port and fit snugly without stretching or kinking the hose. Do not secure the hose yet: Simply check to make sure the port is in the proper orientation.

Once it’s in place, hold the cover and diaphragm in position over the chamber base. Remount the clamp, checking during the process for a good seal all the way around, without the diaphragm being exposed on one side more than the other. When tightening the clamp, alternate the process between the top and bottom bolts to tighten them evenly, and torque them to 25 ±5 ft./lbs.

The air line can now be attached to the fitting. Apply service pressure to let the pushrod come loose, and release the vise grips. Spray the area around the band clamp and hose fittings with a soapy water mix to check for leaks, then release the pressure and, if it’s a drum brake, let the slack adjuster return to the released position.

“Attention to detail is crucial, even during routine maintenance and part replacement,” Pfost said. “So you should always refer to manufacturer guidelines and service data sheets for specific guidelines and part instructions in order to get the best, safest performance and longest life from your chambers and air brake system as a whole.”

This article was contributed by Bendix as part of their Tech Tips series. For more Tech Tips, visit bendix.com.

You May Also Like

Transervice Logistics gets new VP of Northeast operations

Marc Fried will be VP responsible for maintenance and full-service lease operations in the Northeast.

Transervice Logistics has named Marc Fried its vice president of Northeast operations. In this new role, Fried will have responsibility for maintenance and full-service lease operations in the Northeast territory including The New York Times, Verizon, Bimbo, DHL Express, Wakefern, Feldman, WB Meyer, and Dennison Lubricants.

Fried was most recently director of operations for American Expediting Company, a healthcare logistics and medical courier. Prior to that he was regional operations director for modular space solutions company, WillScot, and director of operations for Ryder Systems.

How Decker Truck Line leverages technology to improve operating efficiency

Company ownership remains under the Decker family lineage with Dale Decker’s grandson, Donald, serving as chairman of the board and Donald’s son Dale enlisted as CEO.

Decker-Truck-Line---Mt.-Rainier,-WA-1400
Rockview Farms deploys Volvo LIGHTS project’s final two VNR Electric trucks 

Volvo Trucks deployed its first Class 8 Volvo VNR Electric trucks to fleet operators in 2019.

Economic downturn could be less severe according to latest data

Data from ACT Research reports the potential for limited interest rate increases.

finance-generic
Leasing and Finance Index new business volume for November up y/y

Volume was down 24% from $11.3 billion in October. Year-to-date, cumulative new business volume was up 6% compared to 2021.

Equipment-Leasing-and-Finance-Association’s-survey-of-economic-activity-1400

Other Posts

December Class 8 intake caps off a robust final four months

At 30,300 units, December Class 8 orders show a positive progression moving into the new year.

Penske-Truck-Leasing-Freightliner
A new standard for diesel power is set in California

In 2021, California was the sixth fastest growing state for registrations of these new technology trucks, adding nearly 30,000 new units since 2020.

dtf-logo-1400
Peterbilt of Atlanta announces eighth location

The new location will allow Peterbilt of Atlanta to better serve its customers along the Interstate 16 corridor in Georgia.

Used Class 8 retail sales dropped 19% in November

Longer term, average price and miles were higher y/y, with age up 7% y/y.

Onfleet_6_generic